Projects

Hessle Bridge Hull

Concrete Barriers to Hessle Bridge Hull for Clark Construction on behalf of Hull City Council

This project involved the design, manufacture and installation of 600 lineal metres of our URBAN profile concrete barrier for use in a permanent situation on the bridge to segregate vehicular & pedestrian traffic. It required a number of site visits to plot the bridge cambers, road utilities and expansion joints and this information was incorporated into the working drawings to ensure that installation was carried out quickly and smoothly.

previous arrow
next arrow
ArrowArrow
Shadow
Slider